About Us
- Company
- Customers
- Technical Highlights
- Advantages
- Company History
- Environmentally-friendly Facility
- Patents
- Quality Control
- R&D
- Mucking Loader Manual
- Mucking Loader Technical Description
- Mucking Loader Operation Description
- Mucking Loader Maintenance
- Mucking Loader Operation Notes
- Roadheader Manual
- Roadheader Technical Description
- Roadeheader Maintenance
- Roadheader Notes
- Roadheader Operating Method
- Mine Shuttle Car Manual
- Mine Shuttle Car Maintenance
- Mine Shuttle Car Operation
- Mine Shuttle Car Technical Description
- Mine Shuttle Car Notes
- Trolley Locomotive Maintenance
- Maintenance Manual of Drilling Jumbo
- Contact Us
Roadeheader Maintenance
1. Power off the machine when maintaining its electrical components
and parts.
(1) Prevent other things from mixing with the hydraulic oil.
(2) Replace new oil immediately when the quality of the oil is found influenced.
(3) Replace the filter as per the requirement.
(4) Guarantee the required oil capacity.
(5) Make sure enough cooling water in the oil cooling machine to prevent abnormal rise of the oil temperature.
5. Clean the anti-explosion cover in advance.
6. Grease the anti-explosion cover to prevent rust.
7. Don't keep the cover plate open for a long time and be aware of the water. Don't open the cover plate under high temperature or in abnormal conditions.
8. Repair or replace the broken parts or parts that can not function well immediately.
9. Maintenance of electrical failure should be performed by professional electricians. Be sure to carry out electroprobe testing first to make sure safety.
10. Maintenance should be carried out as per the following standards:
MT/T541.1-1996 Tunnel Road Header Maintenance Standard - Complete Machine Part
MT/T541.2-1996 Tunnel Road Header Maintenance Standard - Mechanical Part
MT/T541.3-1996 Tunnel Road Header Maintenance Standard - Electronic Part
2. Implement daily maintenance strictly as per daily
inspection requirement.
3. Regularly clean the places that are easy to get clumped.
4. Pay special attention to the breakdown caused by the filling of coal dust and water.
Be sure to note the following respects of hydraulic oil management: 3. Regularly clean the places that are easy to get clumped.
4. Pay special attention to the breakdown caused by the filling of coal dust and water.
(1) Prevent other things from mixing with the hydraulic oil.
(2) Replace new oil immediately when the quality of the oil is found influenced.
(3) Replace the filter as per the requirement.
(4) Guarantee the required oil capacity.
(5) Make sure enough cooling water in the oil cooling machine to prevent abnormal rise of the oil temperature.
5. Clean the anti-explosion cover in advance.
6. Grease the anti-explosion cover to prevent rust.
7. Don't keep the cover plate open for a long time and be aware of the water. Don't open the cover plate under high temperature or in abnormal conditions.
8. Repair or replace the broken parts or parts that can not function well immediately.
9. Maintenance of electrical failure should be performed by professional electricians. Be sure to carry out electroprobe testing first to make sure safety.
10. Maintenance should be carried out as per the following standards:
MT/T541.1-1996 Tunnel Road Header Maintenance Standard - Complete Machine Part
MT/T541.2-1996 Tunnel Road Header Maintenance Standard - Mechanical Part
MT/T541.3-1996 Tunnel Road Header Maintenance Standard - Electronic Part