Product List
- Loading, Excavating, Drilling and Bolting Machine
- Single Boom Loading, Excavating, Drilling and Bolting Machine
- Double Boom Loading, Excavating, Drilling and Bolting Machine
- Rock Drilling Equipment
- Double Boom Jumbo
- Single Boom Jumbo
- Tire-type Single-boom Drill Jumbo
- Road Header
- Side Dumping Rock Loader
- Mucking Loader
- Crawler Mucking Loader
- Rail Wheel Mucking Loader
- Wheel Mucking Loader
- Mine Car
- Shutter Mine Car (ST Series)
- Lap Shutter Mine Car (SD Series)
- Side Dump Wagon (KZ Series)
- Mine Side Dump Wagon (MCC Series)
- Other Equipment
- Mining Skip
- Mobile Belt Conveyor
- Battery Locomotive
- Rail Line Concrete Mixing Truck
Tunneling Program Design Option 1
1. This option is ideal for tunnels with small cross section.
2. It suits for tunnels with the angle smaller than 18°.
3. In this option, waste rock can be continuously put into the mine car, which immensely speeds up the loading process and improves the efficiency.
4. It doesn't require large sum input.
5. Waste rock can't be saved in this option.