Elenco prodotti
- Caricamento in corso, di scavo, di perforazione e bullonatura macchina
- Singolo Boom Caricamento, scavando, di perforazione e bullonatura macchina
- Doppia Boom Caricamento, scavando, di perforazione e bullonatura macchina
- Roccia attrezzature di perforazione
- Doppia Boom Jumbo
- Jumbo Boom singolo
- Intestazione strada
- Side Dumping roccia Loader
- PASTICCIARE Loader
- Crawler pasticciare CARICATORE
- Ruota-rotaia PASTICCIARE LOADER
- PALE GOMMATE PASTICCIARE
- La mia auto
- Shutter Mine Car (Serie ST)
- Lap otturatore Mine Car (serie SD)
- Dump Side Wagon (KZ Series)
- La mia Dump Side Wagon (MCC Series)
- Altro equipaggiamento
- Mining Skip
- Cellulare Nastro trasportatore
- Batteria Locomotive
- Linea ferroviaria calcestruzzo di miscelazione camion
Underground Tunneling Drilling Jumbo
Ricerche correlate:
Underground Tunneling Drilling Jumbo
Description
Underground tunneling drilling jumbo is widely applied for construction of roadway, tunnel and culvert in mine, metallurgy, water, power, railway, highway and other projects. This underground drill rig mainly consists of rock drill, drill boom (the bearing, positioning and propelling mechanism), steel structure frame, traveling mechanism and other accessory equipment. This equipment supports several rock drills to work at the same time.
Features
1.The combination of drilling jumbo and slag loading equipment improves construction speed and working condition.
2.It uses drilling and blasting method for underground tunnel construction. Drill-blasting method provides favorable working condition for underground tunneling drill jumbo.
3.Its drilling speed is fast and energy consumption is low.
4.This underground drill rig features small size, compact structure, low center of gravity, high flexibility, stable performance and strong grade ability.
5.This underground tunneling drilling jumbo is configured with anti-jamming device, which features high reliability.
Parameters of Underground Tunneling Drilling Jumbo
Maintenance of Underground Tunneling Drilling Jumbo
A. Daily or Frequently Required Maintenance
B. Periodical Maintenance
C. Maintenance Adjustment on Particular Case
Sometimes we need to adjust the maintenance period and frequency in compliance with the different conditions like temperature, humidity and workload etc to better protect the machine.
Description
Underground tunneling drilling jumbo is widely applied for construction of roadway, tunnel and culvert in mine, metallurgy, water, power, railway, highway and other projects. This underground drill rig mainly consists of rock drill, drill boom (the bearing, positioning and propelling mechanism), steel structure frame, traveling mechanism and other accessory equipment. This equipment supports several rock drills to work at the same time.
Features
1.The combination of drilling jumbo and slag loading equipment improves construction speed and working condition.
2.It uses drilling and blasting method for underground tunnel construction. Drill-blasting method provides favorable working condition for underground tunneling drill jumbo.
3.Its drilling speed is fast and energy consumption is low.
4.This underground drill rig features small size, compact structure, low center of gravity, high flexibility, stable performance and strong grade ability.
5.This underground tunneling drilling jumbo is configured with anti-jamming device, which features high reliability.
Parameters of Underground Tunneling Drilling Jumbo
Model | Unit | CMJ2-17S | CMJ2-17 | CMJ2-30 |
Adaptive cross section | ㎡ | 27 | 17 | 30 |
Hole depth(feed at once) | mm | 3000 | 3100 | 3100 |
boom | 2 | |||
Hole diameter | Mm | Φ43 | Φ43 | Φ43 |
Min. turning radius | mm | 6900 | 6000 | 6500 |
Working range(w*h) | mm | 2800*2800-5700*5200 | 2000*2000-5000*4200 | 3000*3000-6000*5000 |
Stabilization | mm | 1980 | ||
Water pressure | Mpa | 0.8-1.2 | 0.8-1.2 | 0.8-1.2 |
Drill rod | Mm | Drill :B28 drill bit:Φ43 | Drill :B28 drill bit:Φ43 | Drill :B28 drill bit:Φ43 |
weight | kg | 13100 | 8600 | 9800 |
Dimension during transportation (L*W*H) |
Mm | 9750*1650*2370 | 9750*1650*2370 | 9750*1650*2370 |
Model | Unit | CMJ1-14S | CMJ1-14 |
Adaptive tunnel dimension | ㎡ | 14 | 14 |
Hole depth (feed at once) | mm | 2100 | 2100 |
Hole diameter | mm | Φ43 | Φ43 |
Min. turning radius | mm | 6000 | 6000 |
Adaptive cross section(w*h) | mm | 2140*2400-3500*4100 | 2000*2200-3500*4100 |
Stabilization while drilling | Mm | By jack | By jack |
Stabilization | mm | 2140 | 1930 |
Rod size | mm | B28*/2475 | B28*/2475 |
Weight | kg | 8000 | 5300 |
A. Daily or Frequently Required Maintenance
B. Periodical Maintenance
C. Maintenance Adjustment on Particular Case
Sometimes we need to adjust the maintenance period and frequency in compliance with the different conditions like temperature, humidity and workload etc to better protect the machine.