Lista de produse
- Se încarcă, excavarea, de foraj si obturatoare Masini
- Boom unic Se incarca, excavarea, de foraj si obturatoare Masini
- Dublu Boom Loading, excavarea, de foraj si obturatoare Masini
- Rock Echipamente de foraj
- Boom Jumbo dublu
- Jumbo Boom singur
- rutier Antet
- Side dumping Rock Încărcătoare
- bălegarului încărcătoare
- Pe șenile bălegarului Încărcătoare
- Feroviar pe pneuri bălegarului încărcătoare
- Încărcătoare pe cauciucuri bălegarului
- mină de mașini
- Mina auto obturator (ST Series)
- Shutter tur Mina auto (seria SD)
- Cu basculare laterală a vagonului (KZ Series)
- A mea Basculantă laterală a vagonului (MCC Series)
- Alte echipamente pentru
- minerit Skip
- Mobil cu banda transportoare
- Locomotiva baterie
- Șină Linie de beton Camion de amestecare
Underground Tunneling Drilling Jumbo
Căutări asemanatoare:
Underground Tunneling Drilling Jumbo
Description
Underground tunneling drilling jumbo is widely applied for construction of roadway, tunnel and culvert in mine, metallurgy, water, power, railway, highway and other projects. This underground drill rig mainly consists of rock drill, drill boom (the bearing, positioning and propelling mechanism), steel structure frame, traveling mechanism and other accessory equipment. This equipment supports several rock drills to work at the same time.
Features
1.The combination of drilling jumbo and slag loading equipment improves construction speed and working condition.
2.It uses drilling and blasting method for underground tunnel construction. Drill-blasting method provides favorable working condition for underground tunneling drill jumbo.
3.Its drilling speed is fast and energy consumption is low.
4.This underground drill rig features small size, compact structure, low center of gravity, high flexibility, stable performance and strong grade ability.
5.This underground tunneling drilling jumbo is configured with anti-jamming device, which features high reliability.
Parameters of Underground Tunneling Drilling Jumbo
Maintenance of Underground Tunneling Drilling Jumbo
A. Daily or Frequently Required Maintenance
B. Periodical Maintenance
C. Maintenance Adjustment on Particular Case
Sometimes we need to adjust the maintenance period and frequency in compliance with the different conditions like temperature, humidity and workload etc to better protect the machine.
Description
Underground tunneling drilling jumbo is widely applied for construction of roadway, tunnel and culvert in mine, metallurgy, water, power, railway, highway and other projects. This underground drill rig mainly consists of rock drill, drill boom (the bearing, positioning and propelling mechanism), steel structure frame, traveling mechanism and other accessory equipment. This equipment supports several rock drills to work at the same time.
Features
1.The combination of drilling jumbo and slag loading equipment improves construction speed and working condition.
2.It uses drilling and blasting method for underground tunnel construction. Drill-blasting method provides favorable working condition for underground tunneling drill jumbo.
3.Its drilling speed is fast and energy consumption is low.
4.This underground drill rig features small size, compact structure, low center of gravity, high flexibility, stable performance and strong grade ability.
5.This underground tunneling drilling jumbo is configured with anti-jamming device, which features high reliability.
Parameters of Underground Tunneling Drilling Jumbo
Model | Unit | CMJ2-17S | CMJ2-17 | CMJ2-30 |
Adaptive cross section | ㎡ | 27 | 17 | 30 |
Hole depth(feed at once) | mm | 3000 | 3100 | 3100 |
boom | 2 | |||
Hole diameter | Mm | Φ43 | Φ43 | Φ43 |
Min. turning radius | mm | 6900 | 6000 | 6500 |
Working range(w*h) | mm | 2800*2800-5700*5200 | 2000*2000-5000*4200 | 3000*3000-6000*5000 |
Stabilization | mm | 1980 | ||
Water pressure | Mpa | 0.8-1.2 | 0.8-1.2 | 0.8-1.2 |
Drill rod | Mm | Drill :B28 drill bit:Φ43 | Drill :B28 drill bit:Φ43 | Drill :B28 drill bit:Φ43 |
weight | kg | 13100 | 8600 | 9800 |
Dimension during transportation (L*W*H) |
Mm | 9750*1650*2370 | 9750*1650*2370 | 9750*1650*2370 |
Model | Unit | CMJ1-14S | CMJ1-14 |
Adaptive tunnel dimension | ㎡ | 14 | 14 |
Hole depth (feed at once) | mm | 2100 | 2100 |
Hole diameter | mm | Φ43 | Φ43 |
Min. turning radius | mm | 6000 | 6000 |
Adaptive cross section(w*h) | mm | 2140*2400-3500*4100 | 2000*2200-3500*4100 |
Stabilization while drilling | Mm | By jack | By jack |
Stabilization | mm | 2140 | 1930 |
Rod size | mm | B28*/2475 | B28*/2475 |
Weight | kg | 8000 | 5300 |
A. Daily or Frequently Required Maintenance
B. Periodical Maintenance
C. Maintenance Adjustment on Particular Case
Sometimes we need to adjust the maintenance period and frequency in compliance with the different conditions like temperature, humidity and workload etc to better protect the machine.